作者陈学焰(2019)在《管道高温型热收缩带现场补口剥离强度不足问题分析》一文中研究指出:针对某3PE防腐层输气长输管道现场补口合格率仅为82%,远低于合同目标99%问题,从"人机料法环"方面进行分析,找出了剥离强度不足是合格率不足的症结点,经过现场反复实践、验证,结果表明:秋冬季节,按照高温型热收缩带出厂操作说明中"持续加热至130~150℃后10min,以指压法测试合格"后进行管道补口的方法施工,热收缩带剥离强度不达标,摸索到了最佳补火时间为25~30min,完善了高温型热收缩带施工作业指导书。
zhen dui mou 3PEfang fu ceng shu qi chang shu guan dao xian chang bu kou ge ge lv jin wei 82%,yuan di yu ge tong mu biao 99%wen ti ,cong "ren ji liao fa huan "fang mian jin hang fen xi ,zhao chu le bao li jiang du bu zu shi ge ge lv bu zu de zheng jie dian ,jing guo xian chang fan fu shi jian 、yan zheng ,jie guo biao ming :qiu dong ji jie ,an zhao gao wen xing re shou su dai chu an cao zuo shui ming zhong "chi xu jia re zhi 130~150℃hou 10min,yi zhi ya fa ce shi ge ge "hou jin hang guan dao bu kou de fang fa shi gong ,re shou su dai bao li jiang du bu da biao ,mo suo dao le zui jia bu huo shi jian wei 25~30min,wan shan le gao wen xing re shou su dai shi gong zuo ye zhi dao shu 。
论文作者分别是来自石化技术的陈学焰,发表于刊物石化技术2019年07期论文,是一篇关于管道高温型热收缩带论文,现场补口论文,剥离强度论文,问题分析论文,石化技术2019年07期论文的文章。本文可供学术参考使用,各位学者可以免费参考阅读下载,文章观点不代表本站观点,资料来自石化技术2019年07期论文网站,若本站收录的文献无意侵犯了您的著作版权,请联系我们删除。
本文来源: https://www.lw50.cn/article/993614c55a180c1fa35f3567.html